In the original story, I projected having completed parts on hand by now. It was reasonable from speaking with my mold shop, but there have been delays on his end, and we are just getting to the molds now. I have known him and worked with him for more than a decade, he is pretty good on timelines, but not in every case.
.
I deal with it because his quality is good and the work from his shop is a good value to homebuilders. In my last 29 years in business, I have dealt with many suppliers, and have always sought out quality, and accepted some delays to get it. The new projection based on today’s face to face meeting in his shop is 3 weeks to deliverable parts. I’m a little too old to believe in Santa, but still optimistic about what I want for Christmas this year.
.
.
Above , a view of the topside of the finished plug, the inlets have built in rings and are more than 5.5″ in diameter.
.
.
Above, a view of the bottom of the new plug. It has been check with elaborate contour tooling, it is polished next in preparation for making the molds from it.